WANG Wen-ming,YANG Qi-liang,CAI Yi-ting,et al.Application of MSBR Process in Wastewater Treatment Plant with Stringent Discharge Standard[J].China Water & Wastewater,2020,36(16):111-115.
MSBR工藝在高排放標(biāo)準(zhǔn)污水處理廠的應(yīng)用
- Title:
- Application of MSBR Process in Wastewater Treatment Plant with Stringent Discharge Standard
- 關(guān)鍵詞:
- 10單元MSBR工藝; 污水處理廠; 高排放標(biāo)準(zhǔn); 脫氮除磷
- Keywords:
- ten-unit MSBR process; wastewater treatment plant; stringent discharge standard; nitrogen and phosphorus removal
- 摘要:
- 某高排放標(biāo)準(zhǔn)污水處理廠生化處理采用10單元MSBR工藝,主要介紹了10單元MSBR工藝原理、工藝設(shè)計(jì)、調(diào)試過(guò)程及實(shí)際運(yùn)行情況。運(yùn)行結(jié)果表明,新型10單元MSBR工藝出水主要指標(biāo)達(dá)到《地表水環(huán)境質(zhì)量標(biāo)準(zhǔn)》(GB 3838—2002)準(zhǔn)Ⅳ類水質(zhì)(TN≤10 mg/L)指標(biāo)限值,具有占地面積小、進(jìn)水碳源利用率高、脫氮除磷效果好等優(yōu)點(diǎn),是一種可用于高排放標(biāo)準(zhǔn)污水處理廠的先進(jìn)生化工藝方案。
- Abstract:
- The process principle, design, commissioning and actual operation effect of a ten-unit MSBR process for biochemical treatment in a wastewater treatment plant with stringent discharge standard were discussed. The results showed that the major effluent quality indicators (TN≤10 mg/L) reached level quasi Ⅳ criteria in Environmental Quality Standards for Surface Water (GB 3838-2002) and the process had the advantages of small footprint, high utilization rate of influent carbon source, high removal efficiency of nitrogen and phosphorus. Thus, the designed process could be used as an advanced biochemical treatment process for wastewater treatment plant with stringent discharge standard.
相似文獻(xiàn)/References:
[1]王 亮.馬來(lái)西亞Pantai地埋式污水廠環(huán)網(wǎng)供配電結(jié)構(gòu)設(shè)計(jì)[J].中國(guó)給水排水,2018,34(22):63.
WANG Liang.Power Supply and Distribution Structure Design of Ring Network for Pantai Underground Wastewater Treatment Plantin Malaysia[J].China Water & Wastewater,2018,34(16):63.
[2]侯曉慶,鄧 磊,高海英,等.MBR工藝在神定河污水處理廠升級(jí)改造工程中的應(yīng)用[J].中國(guó)給水排水,2018,34(22):66.
HOU Xiao-qing,DENG Lei,GAO Hai-ying,et al.Application of MBR Process in the Upgrading and Reconstruction Project of Shending River WastewaterTreatment Plant[J].China Water & Wastewater,2018,34(16):66.
[3]邱明海.北京市垡頭污水處理廠改擴(kuò)建工程設(shè)計(jì)技術(shù)方案[J].中國(guó)給水排水,2018,34(20):13.
QIU Ming hai.Reconstruction and Expansion Design Technical Plan of Beijing Fatou Wastewater Treatment Plant[J].China Water & Wastewater,2018,34(16):13.
[4]郝二成,郭毅,劉偉巖,等.基于數(shù)學(xué)模擬的污水廠運(yùn)行分析——建模與體檢[J].中國(guó)給水排水,2020,36(15):23.
HAO Er-cheng,GUO Yi,LIU Wei-yan,et al.Operation Analysis of Wastewater Treatment Plant Based on Mathematical Simulation: Modeling and Examination[J].China Water & Wastewater,2020,36(16):23.
[5]張?jiān)?王陽(yáng),張宏偉,等.陽(yáng)泉市污水處理二期工程BARDENPHO工藝設(shè)計(jì)和運(yùn)行[J].中國(guó)給水排水,2020,36(16):64.
ZHANG Yue,WANG Yang,ZHANG Hong-wei,et al.Design and Operation of BARDENPHO Process in Phase Ⅱ Project of Yangquan Wastewater Treatment Plant[J].China Water & Wastewater,2020,36(16):64.
[6]祝新軍,蔡芝斌,姚斌,等.紹興污水處理廠氣浮設(shè)備的優(yōu)化改造[J].中國(guó)給水排水,2020,36(16):101.
ZHU Xin-jun,CAI Zhi-bin,YAO Bin,et al.Optimization and Modification of Air Floatation Equipment in Shaoxing Wastewater Treatment Plant[J].China Water & Wastewater,2020,36(16):101.
[7]郝二成,郭毅,劉偉巖,等.基于數(shù)學(xué)模擬的污水廠運(yùn)行分析——控制與優(yōu)化[J].中國(guó)給水排水,2020,36(17):23.
HAO Er-cheng,GUO Yi,LIU Wei-yan,et al.Operation Analysis of Wastewater Treatment Plant Based on Mathematical Simulation: Control and Optimization[J].China Water & Wastewater,2020,36(16):23.
[8]王陽(yáng),張?jiān)?王曉康,等.高排放標(biāo)準(zhǔn)下的改良AAO+深度處理工程案例[J].中國(guó)給水排水,2020,36(18):56.
WANG Yang,ZHANG Yue,WANG Xiao-kang,et al.Project Case of Modified AAO and Advanced Treatment Process under High Emission Standards[J].China Water & Wastewater,2020,36(16):56.
[9]鄭楓,慕楊,孫遜.MBR工藝用于山東省某污水處理廠擴(kuò)建工程[J].中國(guó)給水排水,2020,36(18):81.
ZHENG Feng,MU Yang,SUN Xun.MBR Process Used in Expansion Project of a Sewage Treatment Plant in Shandong Province[J].China Water & Wastewater,2020,36(16):81.
[10]張莉,余國(guó)富,瞿露,等.重慶市某污水處理廠一級(jí)A提標(biāo)改造運(yùn)行效果分析[J].中國(guó)給水排水,2020,36(18):95.
ZHANG Li,YU Guo-fu,QU Lu,et al.Analysis on the Operation Effect of a WWTP Upgrading Project for the Firstlevel A Standard in Chongqing[J].China Water & Wastewater,2020,36(16):95.